More Camp Progress
Saturday was our last day at the camp property before progressing on to Ceará. Our time in Morros was extremely profitable. Over the last two weeks we have:
1) Installed a circuit breaker box
2) Applied for an electric hookup
3) Contracted a well digger
4) Put together a construction project
5) Met with pastors and laymen to introduce the camp to them and develop the administrative part of the project
5) Cleared out the land for the construction project.
Here are some pictures of number 5, followed by a video update.
The tractor climes the hill. At one point I thought it would not make it.
First step, clearing away the underbrush.
Next: cutting the hill down to size.