More Camp Progress

Saturday was our last day at the camp property before progressing on to Ceará. Our time in Morros was extremely profitable. Over the last two weeks we have:

1) Installed a circuit breaker box
2) Applied for an electric hookup
3) Contracted a well digger
4) Put together a construction project
5) Met with pastors and laymen to introduce the camp to them and develop the administrative part of the project
5) Cleared out the land for the construction project.

Here are some pictures of number 5, followed by a video update.

IMG_20150704_074331564_HDR
The tractor climes the hill. At one point I thought it would not make it.

IMG_20150704_075310487
First step, clearing away the underbrush.

IMG_20150704_094954679
Next: cutting the hill down to size.

Video update: